Client: David Harding & Karin Wood
Value: £220,000
Main contractor: West End Construction Ltd
Project description: The clients required a new annexe area to be added to the dwelling to accommodate a possible nanny or elderly relative to live with the family. They also required a new home office facility and some modifications to the main house to include:
- Two additional bathrooms and refurbishment of three existing bathrooms,
- New steam room facility,
- New timber staircase,
- New septic tank drainage, and
- New heating arrangements throughout the house.
Works undertaken by ghd: Statutory consents were not straightforward due to the conservation area location. Numerous design options were discussed with Development Control resulting in a condition for the annexe to be linked to main house.
The clients spent time abroad and ghd were requested to carry out interior design finishes to the 5nr bathrooms; choosing tile finishes to floors and walls, etc.
Works included for full architectural services from initial design concept to final completion on site.
Design features:
- Glazed link between existing house and new annexe,
- New timber staircase,
- Seated steam room facility,
- Automated flat roof slide opening rooflights to new landing area,
- Conservation rooflights to annexe,
- Flat panelled radiators.